Simulation Based Process Flow Improvement for Wood Framing Home Building Production Lines

Loading...
Thumbnail Image

Institution

University of Alberta

Degree Level

Master's

Degree

Master of Science

Department

Department of Civil and Environmental Engineering

Specialization

Construction Engineering and Management

Supervisor / Co-Supervisor and Their Department(s)

Examining Committee Member(s) and Their Department(s)

Citation for Previous Publication

Link to Related Item

Abstract

This thesis describes a methodology for process improvement of panelized home building production lines through increasing productivity and reducing production cycle time based on lean production and simulation tools. In panelized home building, panels are produced in a factory and then moved to the construction site for assembly. The challenge here is the high customization level in home models and also the wide range of panel types with different design properties which lead to highly variant processing times. In this thesis, a regression-based methodology is proposed which formulates the task times of different activities based on the unique design properties of a panel. The regression models are used as input in the simulation model to validate the process improvement plans such as line balancing and panel sequencing. This methodology is implemented in a home building manufacturer in Edmonton in order to reduce the overall home completion time.

Item Type

http://purl.org/coar/resource_type/c_46ec

Alternative

License

Other License Text / Link

This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law.

Language

en

Location

Time Period

Source