Observation of the design and performance of the Dempster Highway
| dc.contributor.author | Lingnau, B. E. | |
| dc.date.accessioned | 2025-05-29T07:34:40Z | |
| dc.date.available | 2025-05-29T07:34:40Z | |
| dc.date.issued | 1985 | |
| dc.description.abstract | Report of study to provide qualitative and some quantitative observations of design and performance of Dempster Highway in Yukon and NWT 5 years after construction of its final phase (1979). Also suggests engineering recommendations and design improvements to alleviate problems arising from highway construction. | |
| dc.identifier.doi | https://doi.org/10.7939/R3P55DN62 | |
| dc.language.iso | en | |
| dc.rights | This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law. | |
| dc.subject | District of Mackenzie, NW | |
| dc.subject | Northwest Territories | |
| dc.subject | Yukon Territory | |
| dc.subject | Mackenzie Delta | |
| dc.title | Observation of the design and performance of the Dempster Highway | |
| dc.type | http://purl.org/coar/resource_type/c_46ec | |
| thesis.degree.discipline | Civil Engineering | |
| thesis.degree.grantor | University of Alberta | |
| thesis.degree.level | Master's | |
| thesis.degree.name | Master of Engineering | |
| ual.date.graduation | 1985 | |
| ual.department | Department of Civil Engineering | |
| ual.jupiterAccess | http://terms.library.ualberta.ca/public |
Files
Original bundle
1 - 1 of 1
